The construction and repair to the Fellowship Hall has begun. The decision has been made and we are going to have a concrete floor in the fellowship hall. This will stabilize the walls and provide for strentgh to tie in to the kitchen if there is a future need to remodel further.
The base is set. The pour is re-scheduled for Wednesday the 10th. Watch for updates.